Guide
Using Tablendar
Everything Tablendar does, on one page. If something here doesn’t match what you see, write to support@tablendar.com.
1. Getting started
- Install Tablendar from the Google Workspace Marketplace and allow it to use your spreadsheet and calendar. Google shows exactly what is asked for; the privacy policy explains why each permission is needed.
- In any Google Sheet open Extensions → Tablendar → Open panel. The panel opens on the right.
- If the sheet is empty, choose start from a sample sheet in the panel to see a working example.
2. Columns
Tablendar reads the column names in the header row. The header doesn’t have to be the first row — a title line above it is fine.
| Column | Needed? | Also recognised as |
|---|---|---|
| Title | yes | Event, Name, Subject, Task, Activity, Meeting, Program |
| Date | yes | Day, When, Deadline, Due date, Start date |
| Start | no — empty means all day | Start time, From, Time, Begin |
| End | no — empty means one hour | End time, To, Until, Finish |
| End date | no — for events over several days | Last day |
| Location | no | Place, Where, Room, Venue, Address |
| Description | no | Notes, Details, Comments, Info |
| Guests | no — email addresses, at most 50 per row | Attendees, Invitees (a plain “Email” column is never used for invitations) |
| Colour | no — e.g. Tomato, Basil, or 1–11 | Color |
| Repeat Pro | no | Recurrence, Frequency |
| Repeat until Pro | no | Repeat end, Ends on |
| Delete | no — an x removes the event | Remove, Cancel |
Hungarian column names work too. Small differences don’t matter: “Title:”, “Start (time)” and “End / Vége” are all recognised.
Your own column names
If Tablendar doesn’t recognise your columns, the panel says so and offers Set columns: choose which column is the title, the date, the start and so on, and check the line that shows how the first row will be read. Tablendar remembers this for the sheet, even if you move or insert columns later. You can change it any time with the change columns link at the top of the panel.
3. Adding a whole sheet
- Choose the calendar at the top of the panel.
- Press Add whole sheet to calendar. You see a preview: how many events are new, changed or deleted, and which rows have a problem.
- Press Add to calendar. Nothing changes until you do.
Tablendar adds two columns to the right: Event ID links the row to its event, Sync status shows what happened (Added, Updated, Deleted, In calendar, or the reason for a problem). Leave the Event ID column in place: it is how Tablendar knows which event belongs to which row.
The sheet is the source: if you edit such an event in Google Calendar, the next run writes the sheet’s values back into the fields the sheet has columns for.
Tablendar changes or deletes only events it created itself from the same spreadsheet. An ID typed or pasted in from elsewhere (a meeting you were invited to, an event from another file) is reported on that row and left alone. Guests are invited only when you add the whole sheet after its preview, never by “Add selection” or by automatic updating.
- Changing an event: edit the row and add the sheet again. The same event is updated. For a new event, use a new row.
- Deleting an event: put an
xin the Delete column and add the sheet again. - Edits made in Google Calendar are overwritten by the row the next time you add the sheet: the sheet is the source.
- Rows without a title or a date are skipped and listed; the rest are still added.
4. Adding a selection
Select some cells and press Add selection to calendar in the panel, or choose Extensions → Tablendar → Add selection to calendar without opening the panel. There is no preview in this mode: the selection is the instruction.
- Inside a table Tablendar knows, selecting any cell of a row adds that whole row, column by column.
- Anywhere else — beside the table, or on a sheet without column names — Tablendar reads the selected cells themselves, one event per row. The first date is the day, the first one or two times are the start and end, the first text is the title. After that, a place — a room, an address, a city, an online meeting such as Zoom — becomes the location; names of people and anything else go into the description. The order of the cells doesn’t matter.
A name such as Béla or John Smith is never taken for a place. A word Tablendar doesn’t know (the name of a restaurant, say) goes into the description; to make it the location, start it with Place: or @. Note: always means description. Without a header, the event’s ID is kept in a note on the date cell, so adding the same cells again updates the event instead of duplicating it.
Dentist · 2027-03-02 · 3pm · Main Street 12 → “Dentist”, 2 March 2027, 15:00–16:00, at Main Street 12.5. Times and dates
Real date and time cells always work. Tablendar also reads times and dates typed as text:
| You write | Tablendar reads |
|---|---|
15:00, 15.00, 3pm, 3 PM, at 3pm, 15h | 15:00 |
noon, midnight | 12:00, 0:00 |
morning 8, evening 7 | 8:00, 19:00 |
10-12, from 10 to 12, 9:00 to 10:30, 10:45–11:45 | start and end |
2-4 pm, between 2 and 4 pm | 14:00–16:00 |
22:00-06:00 | overnight, ends the next morning |
2027-03-02, 2027.03.02, 2 March 2027, March 2, 2027 | 2 March 2027 |
02.03.2027 | 2 March 2027 (with dots: day first) |
03/02/2027 | reads two ways: see below |
- A plain number like
10counts as an hour in the Start and End columns, or among selected cells when nothing else is a time. - Without am/pm, an hour from 1 to 5 written without a colon is read as afternoon (
3= 15:00,2-4= 14:00–16:00); 6 to 11 as morning. Times with a colon (3:00) are taken as written. - A time written into the date cell (
2027-03-02 10:00) is used when there is no Start column. - A date with slashes or dashes, like
03/02/2027, reads two ways: 3 February or March 2. Tablendar looks at the other dates in the column first: if one of them settles it (25/12/2027= day first,12/25/2027= month first), that convention is used. If none does, the spreadsheet’s locale decides (File → Settings), and the preview marks the row in yellow so you can check it. - Dates without a year are not guessed: such a row is listed as a problem.
6. Repeating events Pro
Add a Repeat column. The Date column is the first occurrence.
| You write | Meaning |
|---|---|
daily, weekly, monthly, yearly | every day / week / month / year |
every 2 weeks, every other week, biweekly | every second week |
weekdays | Monday to Friday |
Mon, Wed, Fri, every Monday, Tuesday and Thursday | weekly on those days |
every 3 weeks on Mon | every third week, on Mondays |
weekly until 2027-06-15 | last possible day: 15 June 2027 |
weekly x10, weekly, 10 times | ten occurrences |
An end date can also go into a separate Repeat until column. Without an end, the event repeats with no end date. If the text can’t be understood, the row is listed as a problem — Tablendar never guesses a repeat rule. Emptying the cell turns the series back into a single event.
If you changed a single occurrence of a series in Google Calendar and later change the series’ time or repeat rule in the sheet, Google Calendar may reset those separately changed occurrences.
7. Automatic updating Pro
Tick Update automatically every hour under the buttons. From then on, new and edited rows of that sheet reach the calendar within an hour, even when the spreadsheet is closed. The panel shows when it last ran and what it did.
- One sheet per spreadsheet can be updated automatically. Ticking the box on another sheet moves it there.
- It runs with the permissions of the person who turned it on. Other editors of the file cannot turn it off or take it over while it runs.
- It never invites anyone: the Guests column is used only when you add the sheet yourself, after the preview. Events that already have guests are not changed or deleted by it either; those rows wait for the whole-sheet preview.
- Anyone who can edit the sheet can, through it, change or delete the events created from this sheet in your calendar. Turn it on only for sheets whose editors you trust.
- Add the sheet by hand once first and check the result: automatic runs have no preview.
8. Saving your calendar to a sheet
On the Save calendar tab choose a calendar and a period (or press This month, Last month, This year) and press Save calendar to a new sheet. You get one row per event — title, date, start, end, end date for events over several days, hours, colour, location, description (and the people invited, if you tick Include guests’ email addresses) — and, if you ask for it, the total hours per event colour or title. Using a colour per client or project turns this into a timesheet.
The new sheet is part of the spreadsheet you are in: everyone it is shared with can see it, including the guests’ email addresses if you included them. A saved sheet is a report: it has no Event ID column, so adding it to a calendar creates new events instead of changing the originals.
9. Time zone
The time zone used for the times in your sheet is shown at the bottom of the panel. It starts as your computer’s time zone and is saved with the spreadsheet, so everyone who uses the same file gets the same result. Change it with change if the times in the sheet belong to a different place.
10. Plans and limits
- Free: 20 new events a month (each saved row counts too). Editing and deleting are free. The panel shows how many are left.
- Pro, Team, Organisation: unlimited, with repeating events and automatic updating. See pricing.
- One run handles up to 300 changes; if a sheet has more, the rest are marked and done the next time.
11. Questions and problems
The menu doesn’t show Tablendar.
Reload the spreadsheet. If the file is an Excel file, save it as a Google Sheet first. In a work or school account, your administrator may need to allow the add-on.
An event is at the wrong time.
Check the time zone at the bottom of the panel. If it is right, check how the cell looks: the panel’s message shows how each event was read.
I got the same event twice.
This happens if the Event ID column (or the note on the date cell) was deleted. A copied row does not cause it: the copy gets an event of its own and the original keeps its event. Delete the extra event in Google Calendar, and keep the ID column as it is.
A row says “repeating events are part of the Pro plan”.
On the free plan rows with a Repeat value are skipped. Empty the cell to add a single event, or upgrade.
Are filtered or hidden rows added too?
Yes. Adding a whole sheet adds every row. To add only some rows, select them and use Add selection to calendar.
How do I remove Tablendar?
Extensions → Add-ons → Manage add-ons → Tablendar → Uninstall, and remove its access at myaccount.google.com/permissions. Events already in your calendar stay there.